Installation process of China Temperature sensor PT100 WZP2MA

Date:2023/3/8 8:55:50 Visits: Author:Dongfang YOYIK Engineering Co; Ltd,

 Installation process of China Temperature sensor PT100 WZP2MA

 
The installation process of Temperature sensor PT100 WZP2MA generally includes the following steps:
Choose the installation location: The installation location of the thermal resistance should be selected at a representative point in the measured temperature field, avoiding too close to edges, corners or places where the fluid flows too fast.
Install the bracket: choose the appropriate bracket according to the actual situation, such as flange, screw, fixed arm, etc., and ensure that the bracket is fixed and firm.
Install the thermal resistance: insert the thermal resistance into the bracket, and make sure the contact between the thermal resistance and the bracket is good.
Connecting cables: According to the type of thermal resistance and the requirements of the cable, connect the cable to the thermal resistance. Generally, good contact and reliable fastening are required.
Fix the cable: Fix the cable on the bracket to avoid shaking and dragging the cable, which will affect the measurement accuracy.
Calibrate the thermal resistance: After installation, the thermal resistance needs to be calibrated to ensure that the measurement accuracy meets the requirements.
Precautions:
Make sure the installation environment is dry and clean, and avoid dust and debris from entering;
The cables of Temperature sensor PT100 WZP2MA should be connected correctly to avoid short circuit or reverse connection;
The contact area between the thermal resistance and the bracket should be large enough, not too tight or too loose;
Calibration should be carried out after installation to avoid deviation.
 
 Temperature sensor PT100 WZP2MA
VOLTAGE TRANSFORMER JDZX-20
Vibration isolator JG 4-2, JG 4-3, JG 4-4
INTELLIGENT REVERSE ROTATING SPEED MONITORING DEVICE JM-C-337
SPEED CONTROLLER JM-C-7F-01-7000
Aux. Relay JT3-31/5
MODULE CHARGER 110DC FOR COAL HANDLING JZ-11010D V
Middle Relay JZC4-22
MONITOR JZ-MC-V
Middle Relay JZX-22F
SCR Thyristor trigger KCF3-0.2/0.3
Thyristors KP500 -16
GAS TRANSMITTER KQF1500
Triple gear gauge KR939SB3
ICU Input coupling unit KS D211B
Side Current Transformer LAJ1-10Q
Current Transformer LBJ1-900A/10V
Current Transformer 110kV LCWB6-126-GYW2
Metal detection sensor LJT-14
Metal Detector LJT-B
DFYLSYC-2023-03-08-A
 

 

 

 

Sensor,Pt100,Temperature