GJCFL-15 China sales power plant Gap system air pipe

Date:2023/6/19 9:35:27 Visits: Author:Dongfang YOYIK Engineering Co; Ltd,

 GJCFL-15 China sales power plant Gap system air pipe

 
The  power plant Gap system air pipe  GJCFL-15 is used for measuring the sealing gap of the air preheater, and the key issue in the control system is the measurement of the deformation of the preheater. The difficulty lies in the fact that the deformed preheater rotor is moving and the temperature inside the air preheater is close to 400 ¡æ, while there is also a large amount of coal ash and corrosive gas inside. It is very difficult to detect the displacement of moving objects in such harsh environments.
Main performance indicators of power plant Gap system air pipe  GJCFL-15
Measurement range: 0-10mm
Resolution: ≥ 0.1mm
Frequency response: ≥ 50Hz
Temperature resistance for sensor: ≥ 420 ¡æ
Temperature resistance for transmitter: ≥ 65 ¡æ
Output signal: 0-10mA 4-20mA
Output signalcan be chosen from 0-10mA or 4-20mA
Maintenance cycle of measuring device: two years (without cooling air device) and four years (with cooling air device installed)
 GJCFL-15 China sales power plant Gap system air pipe
 
Bellows GJCFB-15
TEMPERATURE SENSOR WZP2-221
LVDT Position Sensor C9231124
Gap system air pipe GJCFL-15
Gap Power Supply GJCD-15
Sensor SZCB-01-A2-B1-C3
Bolt Heater HY-CYQ-2.4-380/3
Current/Voltage Converter LJB1 5A/10V 0.5
CREMER Level Meter Probe CEL-3581F/G
Thermocouple WRN2-630
water drum level controller DQS-76
LVDT Position Sensor 6000TDGN
Thermal Resistance WZPM-201
Pt100 temperature probe WZPM2-001
THERMOMETER WTYY-1021
Rotameter WZ-3C
LVDT Position Sensor HL-3-300-15
Turbine Rotation Speed Impactor Monitor HZQW-03A
Bolt Heater HY-CYQ-2.4-380/3
Turbine speed meter DF9011 PRO
Position Sensor TD-1100S
RtdTurbine Bearing 3-Wire Pt100 WZP-231
Thermowell WZPM2-201T
DFYLSYC-2023-06-19-A
air,Pipe,gap,system,Power,plant